Tunnels Double Zig-Zag Traverse Network and Adjustment from DMS Station to Saidapet Station at UAA-03, Chennai Metro Rail Project
Level Traverse Network and Adjustment from DMS Station to Saidapet Station at UAA-03, Chennai Metro Rail Project
Final Tunnel Wriggle Survey from DMS Station to Saidapet Station at UAA-03, Chennai Metro Rail Project
Tunnel Surface Level Monitoring from Mayday Park to AG-DMS Station of Package UAA-02, Chennai Metro Rail Project
Tunnel Surface 3D Monitoring from Mayday Park to AG-DMS Station of Package UAA-02, Chennai Metro Rail Project
Foot by Foot Survey &Preparation of OHE Pegging Plans for Indian Railway Projects
Precise levelling of control Points, Transfer of Bench Marks along the alignment using Leica Digital Level, Level Traverse Network and Adjustment for RT01 Package , Bangalore Metro Rail Project, Phase-II.
Topographic Survey & preparation of 3D plan. Topographic survey for for RT01 Package , Bangalore Metro Rail Project, Phase-II.
Traverse Network for RT02 Package, Bangalore Metro Rail Project, Phase-II.
Precise levelling of control Points, Transfer of Bench Marks along the alignment using Leica Digital Level, Level Traverse Network and Adjustment for RT02 Package , Bangalore Metro Rail Project, Phase-II.
Topographical Survey of Lord Venkateswara Temple, Tirumala
Realignment of Tunnel/Track Alignment works for Mumbai Metro Rail Project, MML3 UGC 02
Realignment of Tunnel/Track Alignment works for Mumbai Metro Rail Project, MML3 UGC 03
Realignment of Tunnel/Track Alignment works for Kanpur Metro Project Package: KNPCC-5
Pre Construction Existing Building Condition Survey for Chennai Metro Project Phase-II Package: UG05
Pre Construction Existing Building Condition Survey for Bangalore Metro Rail Project Phase-II ;RT01