Menu

Sevenhills Survey & Engineers

header photo

Projects

  • Tunnels Double Zig-Zag Traverse Network and Adjustment from DMS Station to Saidapet Station at UAA-03, Chennai Metro Rail Project
  • Level Traverse Network and Adjustment from DMS Station to Saidapet Station at UAA-03,  Chennai Metro Rail Project
  • Final Tunnel Wriggle Survey  from DMS Station to Saidapet Station at UAA-03,  Chennai Metro Rail Project
  • Tunnel Surface Level Monitoring from Mayday Park to AG-DMS Station of Package UAA-02, Chennai Metro Rail Project
  • Tunnel Surface 3D Monitoring from Mayday Park to AG-DMS Station of Package UAA-02, Chennai Metro Rail Project
  • Foot by Foot Survey &Preparation of OHE Pegging Plans for Indian Railway Projects
  • Precise levelling of control Points, Transfer of Bench Marks along the alignment using Leica Digital Level, Level Traverse Network and Adjustment for RT01 Package ,  Bangalore Metro Rail Project, Phase-II.
  • Topographic Survey & preparation of 3D plan. Topographic survey for for RT01 Package ,  Bangalore Metro Rail Project, Phase-II.
  • Traverse Network for RT02 Package, Bangalore Metro Rail Project, Phase-II.  
  • Precise levelling of control Points, Transfer of Bench Marks along the alignment using Leica Digital Level, Level Traverse Network and Adjustment for RT02 Package ,  Bangalore Metro Rail Project, Phase-II.
  • Topographical Survey of Lord Venkateswara Temple, Tirumala
  • Realignment of Tunnel/Track Alignment works for Mumbai Metro Rail Project, MML3 UGC 02 
  • Realignment of Tunnel/Track Alignment works for Mumbai Metro Rail Project, MML3 UGC 03
  • Realignment of Tunnel/Track Alignment works for Kanpur Metro Project Package: KNPCC-5
  • Pre Construction Existing Building Condition Survey for Chennai Metro Project Phase-II Package: UG05
  • Pre Construction Existing Building Condition Survey for Bangalore Metro Rail Project Phase-II ;RT01